Food and supplements inspected per lot, from receiving to shipping.
A wrong label, an unreadable expiry date or foreign matter in the product turn into recalls and lost customers. Traqer brings the same checklist and the same sampling plan to raw material receiving, the line and shipping, with photos as evidence.

Common challenges
- Labeling, lot and expiry date checked by eye, with no record.
- Net weight written in a spreadsheet, with no tolerance per SKU.
- Raw material received with no evidence to dispute with the supplier.
- Each shift inspects the line its own way.
What usually goes into the checklist
Examples of checks your team sets up in the template, without development work.
Measurements
- Net weight
- Volume
- Package dimensions
- Tolerance per SKU
Labeling
- Lot and expiry date
- Ingredient list
- Nutrition facts
- Allergen statement
- Barcode
Product and packaging
- Integrity and sealing
- Color, appearance and texture
- Foreign matter
- Quantity per case
Typical defects by severity
Examples to start your defect catalog. Each company defines its own.
Critical
- Foreign matter in the product
- Tampered or unsealed package
- Allergen not declared on the label
Major
- Weight below tolerance
- Unreadable lot or expiry date
- Wrong or non-standard label
- Color or texture out of standard
Minor
- Light dent on the package
- Minor printing flaw
- Misaligned case label
How Traqer helps
Frequently asked questions
Can I record the lot and expiry date in every inspection?
Yes. Lot and expiry date can be checklist fields, and the record stays in each order's report, with photos of the label.
Can I inspect raw material at receiving?
Yes. The receiving checklist uses the same defect catalog and sampling plan as the supplier's, with photos of every defect as evidence.
Other industries
See Traqer in your inspection process.
In 30 minutes, we show you how to set up a checklist template and a sampling plan for one of your products.
30 min · no commitment · reply within 1 business day